Tuesday, May 18, 2010

Ashley's Graduating

On Friday, May 21 - Ashley will be officially graduating
from Sheridan High School. CONGRATS Ashley and
all the Graduates of 2010.

Friday, May 14, 2010

Just sayin....

Back Door w/ a little glare. This is after we stained
the door facing and Doy was playing w/the sides a little.
All of the vertical wood will be stained the same color.
These BIG windows took a lot of time. Up and Down
the ladder and the scaffolding. Just a shot of the pantry and all of the wood waiting to be stained.
In the kitchen area looking back towards the
living room.

Before & Afters

Before After - Started staining around all the windows in the house. By looking at these pictures - all the windows, door frames, and all of the vertical wood on the lower part of the walls are all stained a darker color than the rest of the house. These have to be done before spraying the ceilings and the rest of the walls.

Septic System

Mark Allen put in our Septic System last week.
We're getting closer !

Monday, May 3, 2010

Making Progress

This weekend was CRAZY !! We had two nights of bad
weather including Tornados in the area so we were a little
hectic around the house. On Saturday and Sunday we
worked on getting the Cypress trees stood up on the
pedestals out front of the house and on the back of the
house. These trees support beams that come out the
structure of the house. They turned out wonderful and
just the way we thought they would. Today (Monday) we're
going to set the other two trees at the back, middle section
of the house that hold up the roof section outside the
kitchen. Carpenter's have finished w/ all the interior
wood and are starting the trim today !! I'll try to take some
pictures this evening of the inside ! It's finally all coming
together now !!